LandMach · Shop by Job
Plan the cut before you choose the excavator
A drainage trench, a row of fence posts and a small foundation cut each need a different working envelope. Define the trench profile, measure the access route and plan where the spoil will go before comparing machines.
Compare equipmentPlan your job Project example01 · Typical jobs
Match equipment to the task
02 · Site checklist
What to confirm before choosing
- Mark the route, confirm underground utilities through the applicable local process and identify any permit or site requirements.
- Measure gates, turns and overhead clearance. Record where the machine will stand and the reach needed from that position.
- Compare bucket width, digging depth, reach and swing clearance in the model documentation. Check the attachment mount and hydraulic circuit.
- Decide how to stage, haul and replace excavated material. Check space for a second machine if hauling is separate from digging.
LandMach · Project example
Example project: a narrow drainage run
Before choosing an excavator, record the trench length, bottom width and target depth, then measure from the intended machine position to the far edge. Plan where the spoil goes and how it returns for backfill.
Measure the cut
Check the required depth and bucket width together.
Check the approach
Include gate hardware, swing clearance and space for the spoil pile.
Models to compare
03 · LandMach equipment
Explore the machines for your job
04 · Buying questions
Frequently asked questions
Will the listed maximum digging depth be enough?
Check the digging envelope at the reach your site requires. The machine position, bucket and work geometry affect the usable depth.
Do I need a separate machine for spoil?
A dumper can help when the spoil pile or loading point is far from the trench. Compare the route width, carrier payload and space to turn or discharge.
Can I use the same bucket for digging and grading?
It depends on the finish and cut. A narrow toothed bucket can shape a trench, while a wider bucket with a straight edge can be more suitable for finishing.
05 · Project inquiries
Tell us about your job
- Trench length, depth and width
- Soil conditions
- Narrowest access point
- Working reach
- Spoil destination
- Preferred attachment





